The reorder used the same composition—but not the same baseline.
17 · Repeat production
The starting point
A replacement material carried the same composition description but different hand and shade.
The development decisions
01
Retrieve the previous baseline.
02
Classify every declared change.
03
Choose proportionate resampling or retesting.
The approval checkpoints
Current reorder release with change table and carried-forward evidence scope.
For a new project with the same issue, connect these checkpoints to the style reference, sample revision and responsible reviewer. An approval for one garment does not establish the performance of a different material, size or construction.